This project included two identical Head Trusses which formed part of the Kearl Lake C8 support structure. The scope of work included Fabrication, Drafting, Procurement, Trial Assembly, Machining, and transportation. The Fabrication included the assembly and welding of Welded Wide Flange Beams.

Details
Owner: FAM
Sector: Industrial
Region: Alberta
Business: Structural
Service: Steel Fabrication
Date: 2019
Tonnage: 415 tonnes
Location: Fort McMurray, Alberta