Supreme Steel supplied and installed 530 tonnes of steel for the company’s head office located at the Acheson Campus. This exciting project was a custom build with unique architectural features meant to showcase the company’s expertise. Offering approximately 1,621 square feet of focal open mezzanine floor area in the middle of the 6,00 square foot Atrium. The main useable floor area is 70,500 square feet comprising of 50,000 square feet of office space, 11,400 square feet of shop services and 6,000 square feet of atrium common area. The building is physically located beside our Supreme Steel Acheson production facility and has significantly contributed to operational efficiencies between the office and shop employees.

Details
Owner: Supreme Steel
Sector: Commercial
Region: Alberta
Business: Structural
Service: Steel Fabrication, Steel Installation
Date: 2017
Tonnage: 550 tonnes
Location: Acheson, Alberta